Process

How your Palm Beach County bathroom remodel runs

Here is the sequence we follow on every bathroom, from a simple vanity swap to a full gut renovation.

  1. 1

    Tell us about the bathroom

    Share photos, measurements and the finish level you want through the assistant, or call and describe it.

  2. 2

    Walkthrough & written scope

    A technician confirms conditions on site, checks plumbing and framing, then puts the scope in writing.

  3. 3

    Selections & schedule

    Tile, fixtures and vanity are locked in, materials staged, and a realistic working window is scheduled.

  4. 4

    Build with daily cleanup

    Floors protected, dust controlled, one point of contact, and progress photos as each stage is completed.

  5. 5

    Punch list & walkthrough

    We test drains, water temperature and fixtures with you, correct the punch list, and leave the room ready to use.

What we need from you

  • Photos of the existing bathroom, including the shower or tub area.
  • Rough dimensions and whether the layout should stay or change.
  • Your finish level and any tile or fixtures you have picked.
  • HOA or building rules if you are in a condo or gated community.
Call 305-360-0342

Prefer to read scopes first? See our bathroom remodeling services.

Call 305-360-0342