Process
How your Palm Beach County bathroom remodel runs
Here is the sequence we follow on every bathroom, from a simple vanity swap to a full gut renovation.
- 1
Tell us about the bathroom
Share photos, measurements and the finish level you want through the assistant, or call and describe it.
- 2
Walkthrough & written scope
A technician confirms conditions on site, checks plumbing and framing, then puts the scope in writing.
- 3
Selections & schedule
Tile, fixtures and vanity are locked in, materials staged, and a realistic working window is scheduled.
- 4
Build with daily cleanup
Floors protected, dust controlled, one point of contact, and progress photos as each stage is completed.
- 5
Punch list & walkthrough
We test drains, water temperature and fixtures with you, correct the punch list, and leave the room ready to use.
What we need from you
- Photos of the existing bathroom, including the shower or tub area.
- Rough dimensions and whether the layout should stay or change.
- Your finish level and any tile or fixtures you have picked.
- HOA or building rules if you are in a condo or gated community.
Prefer to read scopes first? See our bathroom remodeling services.